Energy Star® Pool Pumps (Residential)

In stock
Up to $300.00 rebate per unit (Residential)

High efficiency pool pumps are designed to save energy.

Check eligibility at www.energystar.gov

You are eligible!
Out Of Stock

You have a saved application!

1. Confirm Customer Eligibility

  1. Customer must reside in Texas and receive electric service from El Paso Electric
  2. Single Family Homes (1-4 units)
  3. For Income Qualified incentives, customer must meet Low Income requirements and complete an Income Eligibility Form and supporting documentation.

2. Provide a Written Quote

  1. Contractor must provide the customer with a written quote that includes all work materials before any work is done. http://www.consumer.ftc.gov/articles/0242-hiring-contractor

3. Project Notification/Schedule Inspections

  1. Notify CLEAResult and/or El Paso Electric of upcoming projects before projects are initiated, as well as to schedule pre- and post-installation inspections.
  2. All contractors must schedule pre- and post-installation inspections for their first three projects annually.
  3. All contractors must schedule inspections for at least 15% of submitted projects after their initial three.

4. To Qualify

  1. Must replace a 1-5 horsepower (HP) single-speed pool pump with a 1-5 HP ENERGY STAR® certified variable speed pump (VSP) or ENERGY STAR® certified multi-speed pool pump.
  2. Multi-speed pumps must have a high-speed override capability to revert back to low speed after a period not to exceed 24 hours.
  3. Must be a residential in-ground or above ground pool.
  4. Pools that serve multiple tenants in a common area are not eligible. Pool pumps must be properly calibrated.
  5. Residential Appliance Installer license is required.
  6. Must be ENERGY STAR® version 3.1. www.energystar.gov/productfinder/certified-pool-pumps

5. Complete Incentive Form

  1. Select Project Type: New Construction, Early Retirement or Replace-on-Burnout
  2. Provide Quantity of Pool Pumps Installed and multiply this amount by the Incentive per Pump to calculate the Total Incentive
  3. Provide Existing and New Pool Pump Information: Pool Pump Manufacturer, Model #, Rated HP and Pool Pump Operating Hours

6. Submit Required Documentation for Payment of Each Project

  1. Contractor must submit within 45 days of completion
  1. Incentive Form
  2. Applicable pre/post photographs - refer to portal training manual for sample photos
  3. Invoice - showing EPE incentive and customer out-of-pocket cost
  4. Income Eligibility Form and supporting documentation (Income Qualified only)

7. Quality Control/Quality Assurance

  1. Maintain program compliance – see Probationary Policies & Procedures document