Low-Flow Shower Heads (Low Income)
In stock
For the average American household, water heating is the second largest expense.* By upgrading to a low flow showerhead or faucet aerator, you can significantly reduce your energy costs AND your water bill.
You are eligible!
You have a saved application!
You can either continue where you left off or start over. Starting a new application will delete your saved progress.
1. Confirm Customer Eligibility
- Customer must reside in Texas and receive electric service from El Paso Electric
- Single Family Homes (1-4 units)
- Multifamily Homes (more than 4 units) - Must be individually metered
- For Income Qualified incentives, customer must meet Low Income requirements and complete an Income Eligibility Form and supporting documentation.
2. Provide a Written Quote
- Contractor must provide the customer with a written quote that includes all work materials before any work is done. http://www.consumer.ftc.gov/articles/0242-hiring-contractor
3. Project Notification/Schedule Inspections
- Notify CLEAResult and El Paso Electric of upcoming projects before projects are initiated, as well as to schedule pre- and post-installation inspections.
- All contractors must schedule pre- and post-installation inspections for their first three projects annually.
- All contractors must schedule inspections for at least 15% of submitted projects after their initial three inspections.
- All contractors must install/service an additional measure aside from LEDs.
4. To Qualify Aerators & Low-Flow Showerheads
- Retrofit only
- Must have an electric water heater
- Flow rating must be legible to be eligible for replacement
- Replaced aerators and showerheads must be collected by the contractor and held for inspection by EPE/CLEAResult
- For aerators - Baseline: 2.2 GPM minimum, Efficiency Standard: 1.5 GPM maximum
- For low-flow showerheads – Baseline: 2.5 GPM maximum, Efficiency Standard: 1.5 GPM, 1.75 GPM or 2.0 GPM maximum
5. Complete Incentive Form
6. Submit Required Documentation for Payment of Each Project
- Contractor must submit within 45 days of completion
- Applicable pre/post photographs - Close up picture showing either GPM rating of replace and newly installed device.
- Invoice - showing EPE incentive and customer out-of-pocket cost
- Income Eligibility Form and supporting documentation (Income Qualified only)
7. Quality Control/Quality Assurance
- Visit NREL Standard Work Specifications at https://sws.nrel.gov for guidelines to ensure quality installations based on national best practices.
- Maintain program compliance – see Probationary Policies & Procedures document